Detailed design “Oslarci”
Western entrace of Tripoli
Description
DETAILED DESIGN "OSLARCI"
The section of the highway E-75-LOT 6, locality “Oslarci“, on the chainage from km 898+441.08 to km 898+574.33, construction of the reinforced earth embankment instead of the viaduct, channeling of the Oslarci stream and culvert construction.
On the locality Oslarci, on the chainage from km 898+441.08 to km 898+574.33, according to the Detailed Design of the highway E-75 Belgrade-Niš-border with the FYRoM, Caričina Dolina – Vladičin Han, there are viaducts that are necessary to be replaced with reinforced earth embankments. The alternative for viaducts is 2 walls out of the reinforced earth, on the left and the right bank of the road cross-section, of the various lengths, as a consequence of the terrain settings and integration to the planned functional elements of the highway. Steel culverts are designed on the section of the highway E-75 Lot 6 Caričina Dolina – Vladičin Han, on the section of the bridge redesign, on the chainage km 898+441 to km 898+575 (Oslarci). Chainages of designed culverts are as follows: km 898+532.50 - channeling of the Oslarci stream (Marked as VF8); and km 898+510.00 – culvert for humans and animals (VT21).Info