National road Horgoš – Novi Sad
Description
AS BUILT CONDITIONS SURVEY OF THE NATIONAL ROAD OF THE IA ORDER A1, HORGOŠ-NOVI SAD
Development of geodetic information system, Highway Horgoš-Novi Sad Chainage from km 0+000.00 to km 110+000.00 For maintenance and property rights solving purposes, a detailed object surveying was done (interchanges, crossovers, culverts, traffic signalization etc.), on the fenced part of the Horgoš-Novi Sad highway (chainage from km 0+000.00 to km 110+000.00). Prior to the commencement of works, a localization of transformation field was done, which was later used to transform surveyed detail into the national coordinate system. The geodetic survey was prepared, where property rights on the Horgoš-Novi Sad highway were presented.
Info